Unknown, NJ interconnection queue

3 active projects totalling 1.7 MW in the PJM queue, plus 11 with terminal status (shown greyed).

3active projects
1.7active MW
14total filed
Queue IDProjectkVMWResourceStatus
U2-047 Deans 500kV 500 660 Not reported Withdrawn
Z1-033 Hudson 230kV 230 400 Not reported Withdrawn
Z1-031 Lake Nelson-Middlesex 230kV 230 56 Not reported Withdrawn
Z2-054 Roseland-Williams 230kV 230 44 Not reported Withdrawn
Z2-045 Cedar Grove-Roseland 230kV 230 42 Not reported Withdrawn
Z2-055 Cedar Grove-Clifton 230kV 230 42 Not reported Withdrawn
W2-013 Branchburg-Elroy 500kV 500 33 Not reported Withdrawn
AB1-031A LAKEWOOD 18 KV OCEAN C1-ATLANTIC 230 KV REACTR 18 25 Not reported Withdrawn
Z2-049 Cedar Grove-Williams 230kV 230 21 Not reported Withdrawn
Y1-037 Not reported n/r 6 Solar Withdrawn
I06 Repauno Unit 1 n/r 1.7 Gas In Service
AD2-018 Roseland-Cedar Grove 230kV 230 0 Not reported In Service
AD2-019 Williams-Cedar Grove 230kV 230 0 Not reported In Service
AH2-109 TBD 12.47kV 12.5 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.