Unknown, NJ interconnection queue
3 active projects totalling 1.7 MW in the PJM queue, plus 11 with terminal status (shown greyed).
3active projects
1.7active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U2-047 | Deans 500kV | 500 | 660 | Not reported | Withdrawn |
| Z1-033 | Hudson 230kV | 230 | 400 | Not reported | Withdrawn |
| Z1-031 | Lake Nelson-Middlesex 230kV | 230 | 56 | Not reported | Withdrawn |
| Z2-054 | Roseland-Williams 230kV | 230 | 44 | Not reported | Withdrawn |
| Z2-045 | Cedar Grove-Roseland 230kV | 230 | 42 | Not reported | Withdrawn |
| Z2-055 | Cedar Grove-Clifton 230kV | 230 | 42 | Not reported | Withdrawn |
| W2-013 | Branchburg-Elroy 500kV | 500 | 33 | Not reported | Withdrawn |
| AB1-031A | LAKEWOOD 18 KV OCEAN C1-ATLANTIC 230 KV REACTR | 18 | 25 | Not reported | Withdrawn |
| Z2-049 | Cedar Grove-Williams 230kV | 230 | 21 | Not reported | Withdrawn |
| Y1-037 | Not reported | n/r | 6 | Solar | Withdrawn |
| I06 | Repauno Unit 1 | n/r | 1.7 | Gas | In Service |
| AD2-018 | Roseland-Cedar Grove 230kV | 230 | 0 | Not reported | In Service |
| AD2-019 | Williams-Cedar Grove 230kV | 230 | 0 | Not reported | In Service |
| AH2-109 | TBD 12.47kV | 12.5 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.