Roanoke, VA interconnection queue
1 active project totalling 2.4 MW in the PJM queue, plus 5 with terminal status (shown greyed).
1active projects
2.4active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1679 | Matt Funk 345 kV | 345 | 75 | Battery | Withdrawn |
| AG2-310 | Matt Funk 138 kV | 138 | 70 | Battery | Withdrawn |
| P53 | Bent Mtn. 138kV | 138 | 16.2 | Wind | Withdrawn |
| AA1-007 | Smith Gap Regional Landfill | n/r | 6 | Gas | Withdrawn |
| W1-036 | Central Solar Park | 138 | 5.9 | Wind | Withdrawn |
| AE1-176 | Niagara Power Plant Dam | 12 | 2.4 | Hydro | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.