Larue, KY interconnection queue
1 active project totalling 35 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
35active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-424 | Summersville - Magnolia 69 kV | 69 | 35 | Hybrid | Active |
| AG2-513 | Hodgenville-Sulphur Creek 69 kV | 69 | 12 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.