Larue, KY interconnection queue

1 active project totaling 35 MW in the PJM queue, plus 1 with terminal status (shown grayed).

1active projects
35active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG2-424 Summersville - Magnolia 69 kV 69 35 Hybrid Active
AG2-513 Hodgenville-Sulphur Creek 69 kV 69 12 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.