Queue request J4031 was listed in the MISO interconnection queue at the end of 2025 as a 245 MW solar project in Scott County, IL, according to Berkeley Lab’s queue data file. The filing names 7MEREDOSIA - 7TURNER as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 31, 2030.

Queue IDJ4031
Project nameNot reported
Status (as published)Active
Substation7MEREDOSIA - 7TURNER
Point of interconnection7MEREDOSIA - 7TURNER 345.0kV
CountyScott
StateIL
Voltage345 kV
Capacity245 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2030-01-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

7MEREDOSIA - 7TURNER substation: 3 requests in the MISO queue, 3 active totaling 833 MW.

Queue IDProjectMWResourceStatus
J4000Not reported343SolarActive
J3949Not reported245SolarActive

Scott, IL: 11 requests in the MISO queue, 5 active totaling 1,046.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN TRANSMISSION COMPANY OF ILLINOIS
ClusterDPP Cycle Pending Central
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-05-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first