Scott, IL interconnection queue
5 active projects totaling 1,046.8 MW in the MISO queue, plus 6 with terminal status (shown grayed).
5active projects
1,046.8active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J2703 | Not reported | 345 | 398 | Solar | Withdrawn |
| J4000 | Not reported | 345 | 343 | Solar | Active |
| J3949 | Not reported | 345 | 245 | Solar | Active |
| J4031 | Not reported | 345 | 245 | Solar | Active |
| J3174 | Not reported | 138 | 180 | Solar | Withdrawn |
| S1114 | Surplus; J291 | n/r | 168.8 | Solar | Active |
| J1012 | Not reported | 138 | 100 | Solar | Withdrawn |
| J3683 | Not reported | 138 | 100 | Solar | Withdrawn |
| J291 | Not reported | 138 | 45 | Gas | Operational |
| J3396 | Not reported | 69 | 30 | Solar | Withdrawn |
| J3392 | Not reported | 69 | 25 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner