Substation Scout

7MEREDOSIA - 7TURNER substation interconnection queue

3 active projects totaling 833 MW in the MISO queue.

3 MISO queue filings name 7MEREDOSIA - 7TURNER as the point of interconnection, all in Scott County, IL.

3active projects
833active MW
3total filed
Queue IDProjectkVMWResourceStatus
J4000 Not reported 345 343 Solar Active
J3949 Not reported 345 245 Solar Active
J4031 Not reported 345 245 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.