Queue request J4000 was listed in the MISO interconnection queue at the end of 2025 as a 343 MW solar project in Scott County, IL, according to Berkeley Lab’s queue data file. The filing names 7MEREDOSIA - 7TURNER as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 28, 2030.
| Queue ID | J4000 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | 7MEREDOSIA - 7TURNER |
| Point of interconnection | 7MEREDOSIA - 7TURNER 345.0kV |
| County | Scott |
| State | IL |
| Voltage | 345 kV |
| Capacity | 343 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2030-01-28 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
7MEREDOSIA - 7TURNER substation: 3 requests in the MISO queue, 3 active totaling 833 MW.
Scott, IL: 11 requests in the MISO queue, 5 active totaling 1,046.8 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN TRANSMISSION COMPANY OF ILLINOIS |
|---|---|
| Cluster | DPP Cycle Pending Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2025-04-29 |