Substation Scout

Astoria substation substation interconnection queue

2 active projects totaling 1,286.2 MW in the MISO queue.

2 MISO queue filings name Astoria substation as the point of interconnection, all in Deuel County, SD.

2active projects
1,286.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3941 Not reported 345 1,144 Gas Active
J3400 Not reported 345 142.2 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.