MISO request J3313

MISO queue ID J3313

Queue request J3313 was listed in the MISO interconnection queue at the end of 2025 as a 263 MW wind project in Lenawee County, MI, according to Berkeley Lab’s queue data file. The filing names MOROCCO - ALLEN JUNCTION as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2028.

Queue IDJ3313
Project nameNot reported
Status (as published)Active
SubstationMOROCCO - ALLEN JUNCTION
Point of interconnectionMOROCCO - ALLEN JUNCTION 345.0kV
CountyLenawee
StateMI
Voltage345 kV
Capacity263 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

MOROCCO - ALLEN JUNCTION substation: 2 requests in the MISO queue, 2 active totaling 375 MW.

Queue IDProjectMWResourceStatus
J4126Not reported112WindActive

Lenawee, MI: 22 requests in the MISO queue, 13 active totaling 2,085 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2023 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first