Lenawee, MI interconnection queue
13 active projects totaling 2,085 MW in the MISO queue, plus 9 with terminal status (shown grayed).
13active projects
2,085active MW
22total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3313 | Not reported | 345 | 263 | Wind | Active |
| J4026 | Not reported | 138 | 250 | Battery | Active |
| J1226 | Not reported | 345 | 200 | Solar | Active |
| J1571 | Not reported | n/r | 200 | Solar | Active |
| J2056 | Not reported | 138 | 200 | Hybrid | Withdrawn |
| J4120 | Not reported | n/r | 200 | Wind | Active |
| J4044 | Not reported | 138 | 190 | Solar | Active |
| J3651 | Not reported | 138 | 150 | Battery | Active |
| J3652 | Not reported | 138 | 150 | Solar | Withdrawn |
| J4061 | Not reported | 138 | 150 | Solar | Active |
| J875 | Not reported | 138 | 150 | Solar | Active |
| S1066 | Surplus; J875 | n/r | 150 | Hybrid | Active |
| J197 | Not reported | 138 | 124.8 | Wind | Withdrawn |
| J4126 | Not reported | 345 | 112 | Wind | Active |
| J1639 | Not reported | 345 | 100 | Battery | Withdrawn |
| J2471 | Not reported | 138 | 100 | Solar | Withdrawn |
| J188 | Not reported | 138 | 99 | Wind | Withdrawn |
| J088 | Not reported | 138 | 81 | Wind | Withdrawn |
| J1173 | Not reported | 138 | 80 | Solar | Withdrawn |
| J996 | Not reported | 138 | 80 | Solar | Active |
| J1860 | Not reported | 138 | 60 | Battery | Withdrawn |
| L003 | Not reported | n/r | -10 | Other | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.