Substation Scout

MISO request J837

MISO queue ID J837

Queue request J837 was listed in the MISO interconnection queue at the end of 2025 as a 200.1 MW wind project in White County, IN, according to Berkeley Lab’s queue data file. The filing names Reynolds Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 15, 2021.

Queue IDJ837
Project nameNot reported
Status (as published)Operational
SubstationReynolds Substation
Point of interconnectionReynolds 345kV Substation
CountyWhite
StateIN
Voltage345 kV
Capacity200.1 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2021-08-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Reynolds Substation substation: 7 requests in the MISO queue, 6 active totaling 1,400.2 MW.

Queue IDProjectMWResourceStatus
J2496Not reported400BatteryActive
J838Not reported200.1WindOperational
J1069Not reported200WindActive
J913Not reported200SolarOperational
J968Not reported200WindOperational
G864Not reported200WindWithdrawn

White, IN: 28 requests in the MISO queue, 14 active totaling 2,508.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNORTHERN INDIANA PUBLIC SERVICE COMPANY
ClusterDPP-2017-AUG Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: In Service
Queue date2017-06-16
Interconnection agreement date2019-10-21
Operational date2021-08-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.