Substation Scout

Worth, IA interconnection queue

8 active projects totaling 1,135 MW in the MISO queue, plus 7 with terminal status (shown grayed).

8active projects
1,135active MW
15total filed
Queue IDProjectkVMWResourceStatus
J2342 Not reported n/r 230 Wind Active
G046 Not reported n/r 200 Wind Operational
G331 Not reported 161 200 Wind Withdrawn
J2462 Not reported 345 200 Battery Withdrawn
J2464 Not reported 345 200 Solar Withdrawn
J1174 Not reported 345 165 Solar Active
J1175 Not reported 345 165 Wind Active
J1416 Not reported 161 149 Solar Withdrawn
J1520 Not reported n/r 135 Solar Active
G702 Not reported 161 110 Wind Withdrawn
G540 Not reported 161 80 Wind Operational
G548 Not reported 161 80 Wind Operational
S1051 Surplus; Old Gold 161 80 Hybrid Active
J1417 Not reported 345 75 Battery Withdrawn
J885 Not reported 161 64 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first