Substation Scout

MISO request G046

MISO queue ID G046

Queue request G046 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Worth County, IA, according to Berkeley Lab’s queue data file. The filing names Worth County switching station as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of January 1, 2002.

Queue IDG046
Project nameNot reported
Status (as published)Operational
SubstationWorth County switching station
Point of interconnectionWorth County switching station
CountyWorth
StateIA
VoltageNot reported
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2002-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Worth, IA: 15 requests in the MISO queue, 8 active totaling 1,135 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG046 G046
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2000-07-23
Interconnection agreement date2003-11-24
Operational date2002-01-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first