Surplus; Old Gold
MISO queue ID S1051
Surplus; Old Gold (S1051) was listed in the MISO interconnection queue at the end of 2025 as a 80 MW hybrid project in Worth County, IA, according to Berkeley Lab’s queue data file. The filing names Worth County Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 15, 2029.
| Queue ID | S1051 |
|---|---|
| Project name | Surplus; Old Gold |
| Status (as published) | Active |
| Substation | Worth County Substation |
| Point of interconnection | Worth County Substation 161kV |
| County | Worth |
| State | IA |
| Voltage | 161 kV |
| Capacity | 80 MW |
| Resource (as published) | Other+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2029-03-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Worth, IA: 15 requests in the MISO queue, 8 active totaling 1,135 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ITC MIDWEST |
|---|---|
| Project type | Generation |
| Queue date | 2024-06-03 |
| Components (hybrid) | Other 80 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.