Substation Scout

MISO request G540

MISO queue ID G540

Queue request G540 was listed in the MISO interconnection queue at the end of 2025 as a 80 MW wind project in Worth County, IA, according to Berkeley Lab’s queue data file. The filing names Adams - Lime Creek as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 1, 2007.

Queue IDG540
Project nameNot reported
Status (as published)Operational
SubstationAdams - Lime Creek
Point of interconnectionAdams - Lime Creek 161 kV
CountyWorth
StateIA
Voltage161 kV
Capacity80 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2007-11-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Adams - Lime Creek substation: 2 requests in the MISO queue, 1 active totaling 80 MW.

Queue IDProjectMWResourceStatus
G331Not reported200WindWithdrawn

Worth, IA: 15 requests in the MISO queue, 8 active totaling 1,135 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterCS5
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2005-09-01
Interconnection agreement date2008-12-15
Operational date2007-11-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first