Substation Scout

Wood, WI interconnection queue

6 active projects totaling 670 MW in the MISO queue, plus 8 with terminal status (shown grayed).

6active projects
670active MW
14total filed
Queue IDProjectkVMWResourceStatus
G062 Not reported n/r 755 Other Withdrawn
G036 Not reported n/r 600 Other Withdrawn
J2559 Not reported n/r 200 Solar Active
G268 Not reported n/r 189 Gas Withdrawn
J1751 Not reported 138 150.5 Solar Active
J986 Not reported 138 149.8 Solar Active
J1510 Not reported 345 100 Solar Withdrawn
J2557 Not reported n/r 100 Battery Withdrawn
G078 Not reported n/r 85 Other Withdrawn
G145 Not reported n/r 85 Other Withdrawn
G588 Not reported 115 59.7 Gas Operational
J142 Not reported 115 59.7 Gas Operational
S1096 Surplus; J1751 138 50.3 Hybrid Active
J2833 Not reported 69 40 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first