Wood, WI interconnection queue
6 active projects totaling 670 MW in the MISO queue, plus 8 with terminal status (shown grayed).
6active projects
670active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G062 | Not reported | n/r | 755 | Other | Withdrawn |
| G036 | Not reported | n/r | 600 | Other | Withdrawn |
| J2559 | Not reported | n/r | 200 | Solar | Active |
| G268 | Not reported | n/r | 189 | Gas | Withdrawn |
| J1751 | Not reported | 138 | 150.5 | Solar | Active |
| J986 | Not reported | 138 | 149.8 | Solar | Active |
| J1510 | Not reported | 345 | 100 | Solar | Withdrawn |
| J2557 | Not reported | n/r | 100 | Battery | Withdrawn |
| G078 | Not reported | n/r | 85 | Other | Withdrawn |
| G145 | Not reported | n/r | 85 | Other | Withdrawn |
| G588 | Not reported | 115 | 59.7 | Gas | Operational |
| J142 | Not reported | 115 | 59.7 | Gas | Operational |
| S1096 | Surplus; J1751 | 138 | 50.3 | Hybrid | Active |
| J2833 | Not reported | 69 | 40 | Hybrid | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.