Substation Scout

Surplus; J1751

MISO queue ID S1096

Surplus; J1751 (S1096) was listed in the MISO interconnection queue at the end of 2025 as a 50.3 MW hybrid project in Wood County, WI, according to Berkeley Lab’s queue data file. The filing names Saratoga - Badger West as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 1, 2028.

Queue IDS1096
Project nameSurplus; J1751
Status (as published)Active
SubstationSaratoga - Badger West
Point of interconnectionSaratoga - Badger West 138.0kV
CountyWood
StateWI
Voltage138 kV
Capacity50.3 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-02-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Saratoga - Badger West substation: 2 requests in the MISO queue, 2 active totaling 200.8 MW.

Queue IDProjectMWResourceStatus
J1751Not reported150.5SolarActive

Wood, WI: 14 requests in the MISO queue, 6 active totaling 670 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMERICAN TRANSMISSION COMPANY
Project typeGeneration
Queue date2025-05-20
Components (hybrid)Solar 50.3 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first