Queue request G588 was listed in the MISO interconnection queue at the end of 2025 as a 59.7 MW gas project in Wood County, WI, according to Berkeley Lab’s queue data file. The filing names Hume - Arpin as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of January 1, 2007.

Queue IDG588
Project nameNot reported
Status (as published)Operational
SubstationHume - Arpin
Point of interconnectionHume - Arpin 115kV
CountyWood
StateWI
Voltage115 kV
Capacity59.7 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2007-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Wood, WI: 14 requests in the MISO queue, 6 active totaling 670 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG588 G588
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2006-01-06
Interconnection agreement date2007-04-04
Operational date2007-01-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.