Substation Scout

MISO request J142

MISO queue ID J142

Queue request J142 was listed in the MISO interconnection queue at the end of 2025 as a 59.7 MW gas project in Wood County, WI, according to Berkeley Lab’s queue data file. The filing names Arpin - Hume as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of March 31, 2011.

Queue IDJ142
Project nameNot reported
Status (as published)Operational
SubstationArpin - Hume
Point of interconnectionArpin - Hume 115kV
CountyWood
StateWI
Voltage115 kV
Capacity59.7 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2011-03-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Wood, WI: 14 requests in the MISO queue, 6 active totaling 670 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2010-06-14
Interconnection agreement date2011-03-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.