Washtenaw, MI interconnection queue
13 active projects totaling 3,053.1 MW in the MISO queue, plus 17 with terminal status (shown grayed).
13active projects
3,053.1active MW
30total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3923 | Not reported | 345 | 1,414 | Gas | Active |
| G134 | Not reported | n/r | 840 | Other | Withdrawn |
| G047 | Not reported | n/r | 340 | Gas | Withdrawn |
| J3945 | Not reported | 345 | 245 | Solar | Active |
| J1062 | Not reported | 345 | 200 | Solar | Active |
| J1068 | Not reported | 120 | 200 | Wind | Withdrawn |
| J3786 | Not reported | 230 | 200 | Battery | Withdrawn |
| J799 | Not reported | 120 | 189 | Solar | Active |
| J1237 | Not reported | 345 | 175 | Solar | Withdrawn |
| J1224 | Not reported | 345 | 170 | Solar | Active |
| G077 | Not reported | n/r | 150 | Other | Withdrawn |
| J1256 | Not reported | 120 | 150 | Solar | Withdrawn |
| J3009 | Not reported | n/r | 150 | Battery | Active |
| J3333 | Not reported | 345 | 150 | Solar | Withdrawn |
| J3654 | Not reported | 120 | 150 | Battery | Active |
| S1067 | Surplus; J1062 | 345 | 150 | Hybrid | Active |
| J1659 | Not reported | n/r | 100 | Battery | Active |
| J1844 | Not reported | n/r | 100 | Battery | Active |
| J207 | Not reported | 120 | 100 | Solar | Withdrawn |
| J419 | Not reported | 120 | 100 | Solar | Withdrawn |
| J833 | Not reported | 120 | 100 | Solar | Withdrawn |
| S1065 | Surplus; J1224/J1329 | 345 | 85.1 | Hybrid | Active |
| J3653 | Not reported | 120 | 80 | Solar | Active |
| J420 | Not reported | n/r | 75 | Solar | Withdrawn |
| J1046 | Not reported | 345 | 50 | Battery | Withdrawn |
| J1977 | Not reported | 120 | 50 | Battery | Withdrawn |
| J1987 | Not reported | n/r | 50 | Battery | Withdrawn |
| J219 | Not reported | 120 | 46 | Gas | Withdrawn |
| J1451 | Not reported | 120 | 25 | Battery | Withdrawn |
| J1329 | Not reported | 345 | 20 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.