Surplus; J1224/J1329
MISO queue ID S1065
Surplus; J1224/J1329 (S1065) was listed in the MISO interconnection queue at the end of 2025 as a 85.1 MW hybrid project in Washtenaw County, MI, according to Berkeley Lab’s queue data file. The filing names Majestic to Milan as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2028.
| Queue ID | S1065 |
|---|---|
| Project name | Surplus; J1224/J1329 |
| Status (as published) | Active |
| Substation | Majestic to Milan |
| Point of interconnection | Majestic 345kV to Milan 345kV |
| County | Washtenaw |
| State | MI |
| Voltage | 345 kV |
| Capacity | 85.1 MW |
| Resource (as published) | Other+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2028-09-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Washtenaw, MI: 30 requests in the MISO queue, 13 active totaling 3,053.1 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ITC |
|---|---|
| Project type | Generation |
| Queue date | 2024-10-07 |
| Components (hybrid) | Other 85.05 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.