Surplus; J1062

MISO queue ID S1067

Surplus; J1062 (S1067) was listed in the MISO interconnection queue at the end of 2025 as a 150 MW hybrid project in Washtenaw County, MI, according to Berkeley Lab’s queue data file. The filing names Majestic- Lemoyne as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2027.

Queue IDS1067
Project nameSurplus; J1062
Status (as published)Active
SubstationMajestic- Lemoyne
Point of interconnectionMajestic- Lemoyne 345 kV
CountyWashtenaw
StateMI
Voltage345 kV
Capacity150 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Washtenaw, MI: 30 requests in the MISO queue, 13 active totaling 3,053.1 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC
Project typeGeneration
Queue date2024-10-02
Components (hybrid)Other 150 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.