Substation Scout

MISO request J3923

MISO queue ID J3923

Queue request J3923 was listed in the MISO interconnection queue at the end of 2025 as a 1,414 MW gas project in Washtenaw County, MI, according to Berkeley Lab’s queue data file. The filing names Majestic-Milan Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2030.

Queue IDJ3923
Project nameNot reported
Status (as published)Active
SubstationMajestic-Milan Line
Point of interconnectionMajestic-Milan 345 kV Line
CountyWashtenaw
StateMI
Voltage345 kV
Capacity1,414 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2030-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Washtenaw, MI: 30 requests in the MISO queue, 13 active totaling 3,053.1 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC
ClusterDPP Cycle Pending East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-02-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.