MISO request J3923
MISO queue ID J3923
Queue request J3923 was listed in the MISO interconnection queue at the end of 2025 as a 1,414 MW gas project in Washtenaw County, MI, according to Berkeley Lab’s queue data file. The filing names Majestic-Milan Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2030.
| Queue ID | J3923 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Majestic-Milan Line |
| Point of interconnection | Majestic-Milan 345 kV Line |
| County | Washtenaw |
| State | MI |
| Voltage | 345 kV |
| Capacity | 1,414 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2030-03-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Washtenaw, MI: 30 requests in the MISO queue, 13 active totaling 3,053.1 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ITC |
|---|---|
| Cluster | DPP Cycle Pending East (ITC) |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2025-02-28 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.