Vigo, IN interconnection queue

12 active projects totaling 2,973.8 MW in the MISO queue, plus 11 with terminal status (shown grayed).

12active projects
2,973.8active MW
23total filed
Queue IDProjectkVMWResourceStatus
J542 Not reported n/r 1,235 Gas Withdrawn
G009 Not reported n/r 640 Other Withdrawn
G780 Not reported n/r 578 Gas Operational
G010 Not reported 345 500 Gas Operational
J3942 Not reported n/r 365 Solar Active
J3943 Not reported n/r 337 Solar Active
G399 Not reported n/r 300 Gas Withdrawn
APP-100248 Sandcut Storage 230 279.7 Hybrid Active
J2513 Not reported 230 220 Solar Withdrawn
J3247 Not reported n/r 200 Battery Withdrawn
J334 Not reported 138 180 Coal Operational
J1721 Not reported n/r 175.1 Solar Active
J333 Not reported 230 170 Coal Operational
J3285 Not reported n/r 150 Solar Withdrawn
J3317 Not reported n/r 150 Hybrid Withdrawn
J3724 Not reported n/r 132 Solar Active
J2216 Not reported 138 100 Solar Withdrawn
J2301 Not reported n/r 100 Hybrid Active
J2329 Not reported 230 100 Battery Withdrawn
J2360 Not reported n/r 90 Battery Withdrawn
J3870 Not reported n/r 87 Gas Active
J4034 Not reported 345 70 Solar Active
J3478 Not reported n/r 35 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.