Queue request J333 was listed in the MISO interconnection queue at the end of 2025 as a 170 MW coal project in Vigo County, IN, according to Berkeley Lab’s queue data file. The filing names Wabash River Bus as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 31, 2010.

Queue IDJ333
Project nameNot reported
Status (as published)Operational
SubstationWabash River Bus
Point of interconnectionWabash River 230 kV Bus
CountyVigo
StateIN
Voltage230 kV
Capacity170 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2010-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Wabash River Bus substation: 2 requests in the MISO queue, 2 active totaling 350 MW.

Queue IDProjectMWResourceStatus
J334Not reported180CoalOperational

Vigo, IN: 23 requests in the MISO queue, 12 active totaling 2,973.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2014-AUG Central
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2014-05-16
Interconnection agreement date2014-11-20
Operational date2010-12-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.