MISO queue ID APP-100248

Sandcut Storage (APP-100248) was listed in the MISO interconnection queue at the end of 2025 as a 279.7 MW hybrid project in Vigo County, IN, according to Berkeley Lab’s queue data file. The filing names Wabash River - Whitesville South as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2028.

Queue IDAPP-100248
Project nameSandcut Storage
Status (as published)Active
SubstationWabash River - Whitesville South
Point of interconnectionWabash River - Whitesville South 230 kV
CountyVigo
StateIN
Voltage230 kV
Capacity279.7 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Vigo, IN: 23 requests in the MISO queue, 12 active totaling 2,973.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityHoosier Energy
DeveloperHoosier Energy / Solvenz
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: In Review; Post GIA Status: Not started
Queue date2025-12-22
Components (hybrid)Solar 279.72 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first