Substation Scout

Vermilion, IL interconnection queue

8 active projects totaling 1,092 MW in the MISO queue, plus 11 with terminal status (shown grayed).

8active projects
1,092active MW
19total filed
Queue IDProjectkVMWResourceStatus
J388 Not reported 345 800 Gas Withdrawn
J1656 Not reported 345 412 Hybrid Withdrawn
J3562 Not reported 138 300 Solar Withdrawn
H100 Not reported 138 200 Wind Operational
J1617 Not reported 138 200 Solar Withdrawn
J1718 Not reported 345 200 Wind Withdrawn
J3371 Not reported n/r 200 Solar Withdrawn
S1097 Surplus; AMIL.TILT1-4 n/r 188 Solar Active
J3342 Not reported n/r 180 Solar Active
J3340 Not reported 138 175 Solar Active
J1770 Not reported 138 150 Wind Withdrawn
J2414 Not reported 138 150 Solar Withdrawn
J2434 Not reported 138 150 Wind Withdrawn
J3328 Not reported n/r 150 Wind Withdrawn
J2233 Not reported 345 100 Solar Active
J3341 Not reported n/r 100 Wind Active
J2192 Not reported 345 99.9 Wind Withdrawn
H094 Not reported 138 99 Wind Operational
J196 Not reported 138 50 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first