Substation Scout

Surplus; AMIL.TILT1-4

MISO queue ID S1097

Surplus; AMIL.TILT1-4 (S1097) was listed in the MISO interconnection queue at the end of 2025 as a 188 MW solar project in Vermilion County, IL, according to Berkeley Lab’s queue data file. The filing names Tilton Switchyard as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2027.

Queue IDS1097
Project nameSurplus; AMIL.TILT1-4
Status (as published)Active
SubstationTilton Switchyard
Point of interconnectionTilton Switchyard
CountyVermilion
StateIL
VoltageNot reported
Capacity188 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Vermilion, IL: 19 requests in the MISO queue, 8 active totaling 1,092 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
Project typeGeneration
Queue date2025-05-23

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.