MISO request J3340
MISO queue ID J3340
Queue request J3340 was listed in the MISO interconnection queue at the end of 2025 as a 175 MW solar project in Vermilion County, IL, according to Berkeley Lab’s queue data file. The filing names Rossville on the Hoopeston to Vermilion Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2028.
| Queue ID | J3340 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Rossville on the Hoopeston to Vermilion Line |
| Point of interconnection | Rossville 138kV on the Hoopeston to Vermilion 138kV Line |
| County | Vermilion |
| State | IL |
| Voltage | 138 kV |
| Capacity | 175 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2028-09-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Vermilion, IL: 19 requests in the MISO queue, 8 active totaling 1,092 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN ILLINOIS |
|---|---|
| Cluster | DPP-2023 Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Study Phase: DPP 1 |
| Queue date | 2024-03-18 |