Substation Scout

MISO request H094

MISO queue ID H094

Queue request H094 was listed in the MISO interconnection queue at the end of 2025 as a 99 MW wind project in Vermilion County, IL, according to Berkeley Lab’s queue data file. The filing names 22 N Range: 12 West/1/50 miles west of Rossville, IL/ line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 31, 2010.

Queue IDH094
Project nameNot reported
Status (as published)Operational
Substation22 N Range: 12 West/1/50 miles west of Rossville, IL/ line
Point of interconnection22 N Range: 12 West/1/50 miles west of Rossville, IL/138kV line
CountyVermilion
StateIL
Voltage138 kV
Capacity99 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2010-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Vermilion, IL: 19 requests in the MISO queue, 8 active totaling 1,092 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2009-MAR IL
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2008-07-28
Interconnection agreement date2011-01-04
Operational date2010-12-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first