Substation Scout

Tama, IA interconnection queue

4 active projects totaling 423.4 MW in the MISO queue, plus 8 with terminal status (shown grayed).

4active projects
423.4active MW
12total filed
Queue IDProjectkVMWResourceStatus
J298 Not reported 161 300 Wind Withdrawn
J461 Not reported n/r 299.2 Wind Withdrawn
J2095 Not reported n/r 212 Battery Withdrawn
J3462 Not reported 161 187 Solar Withdrawn
J1365 Not reported n/r 169.4 Wind Active
H009 Not reported 161 150 Wind Operational
J096 Not reported 115 150 Wind Withdrawn
J114 Not reported n/r 150 Wind Withdrawn
J2031 Not reported n/r 100 Wind Active
H039 Not reported 115 71 Wind Withdrawn
J3544 Not reported n/r 62 Wind Withdrawn
G286 Not reported 34.5 4 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first