MISO request J1365

MISO queue ID J1365

Queue request J1365 was listed in the MISO interconnection queue at the end of 2025 as a 169.4 MW wind project in Tama County, IA, according to Berkeley Lab’s queue data file. The filing names Traer 161-kV Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 6, 2024.

Queue IDJ1365
Project nameNot reported
Status (as published)Active
SubstationTraer 161-kV Substation
Point of interconnectionTraer 161-kV Substation
CountyTama
StateIA
VoltageNot reported
Capacity169.4 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2024-09-06
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tama, IA: 12 requests in the MISO queue, 4 active totaling 423.4 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC MIDWEST
ClusterDPP-2019 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2019-04-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.