MISO request J2031

MISO queue ID J2031

Queue request J2031 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW wind project in Tama County, IA, according to Berkeley Lab’s queue data file. The filing names Toledo as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 15, 2026.

Queue IDJ2031
Project nameNot reported
Status (as published)Active
SubstationToledo
Point of interconnectionToledo
CountyTama
StateIA
VoltageNot reported
Capacity100 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2026-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tama, IA: 12 requests in the MISO queue, 4 active totaling 423.4 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC MIDWEST
ClusterDPP-2021 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 3; Post GIA Status: Not Started
Queue date2021-08-13

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.