Substation Scout

MISO request J291

MISO queue ID J291

Queue request J291 was listed in the MISO interconnection queue at the end of 2025 as a 45 MW gas project in Scott County, IL, according to Berkeley Lab’s queue data file. The filing names PPI Alsey Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 1, 2016.

Queue IDJ291
Project nameNot reported
Status (as published)Operational
SubstationPPI Alsey Substation
Point of interconnectionPPI Alsey 138kV Substation
CountyScott
StateIL
Voltage138 kV
Capacity45 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2016-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Scott, IL: 11 requests in the MISO queue, 5 active totaling 1,046.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2015-AUG Central
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2013-08-12
Interconnection agreement date2016-04-25
Operational date2016-09-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first