Substation Scout

Sanilac, MI interconnection queue

11 active projects totaling 2,361.2 MW in the MISO queue, plus 12 with terminal status (shown grayed).

11active projects
2,361.2active MW
23total filed
Queue IDProjectkVMWResourceStatus
J308 Not reported 345 301 Wind Withdrawn
J1557 Not reported 345 293 Wind Active
J3977 Not reported 345 250 Battery Active
J3496 Not reported 345 220 Wind Active
E0019 Deckerville Solar Park Project 345 213.2 Solar Active
J1196 Not reported 345 200 Solar Active
J1905 Not reported 345 200 Solar Withdrawn
J1912 Not reported 345 200 Solar Withdrawn
J203 Not reported 345 200 Wind Withdrawn
J2374 Not reported n/r 200 Solar Active
J2667 Not reported 345 200 Solar Active
J2878 Not reported 345 200 Solar Active
J3286 Not reported 120 200 Solar Active
J3633 Not reported 345 200 Solar Active
J408 Not reported 345 200 Wind Withdrawn
J537 Not reported 345 200 Wind Withdrawn
J1944 Not reported 345 185 Solar Active
G504 Not reported 120 158 Wind Withdrawn
J496 Not reported n/r 151.8 Wind Withdrawn
J321 Not reported 345 151.2 Wind Withdrawn
J1317 Not reported 120 150 Wind Withdrawn
J247 Not reported 120 150 Wind Withdrawn
J452 Not reported 120 150 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.