Substation Scout

MISO request J1557

MISO queue ID J1557

Queue request J1557 was listed in the MISO interconnection queue at the end of 2025 as a 293 MW wind project in Sanilac County, MI, according to Berkeley Lab’s queue data file. The filing names GREENWOOD - RAPSON (BANNER) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 1, 2026.

Queue IDJ1557
Project nameNot reported
Status (as published)Active
SubstationGREENWOOD - RAPSON (BANNER)
Point of interconnectionGREENWOOD - RAPSON (BANNER) 345.0kV
CountySanilac
StateMI
Voltage345 kV
Capacity293 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2026-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

GREENWOOD - RAPSON (BANNER) substation: 3 requests in the MISO queue, 3 active totaling 678 MW.

Queue IDProjectMWResourceStatus
J3633Not reported200SolarActive
J1944Not reported185SolarActive

Sanilac, MI: 23 requests in the MISO queue, 11 active totaling 2,361.2 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC
ClusterDPP-2020 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA Complete; Post GIA Status: Not Started
Queue date2020-06-23
Interconnection agreement date2023-11-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.