Sangamon, IL interconnection queue

11 active projects totaling 2,627.7 MW in the MISO queue, plus 9 with terminal status (shown grayed).

11active projects
2,627.7active MW
20total filed
Queue IDProjectkVMWResourceStatus
J955 Not reported 345 1,165 Gas Active
J038 Not reported 138 498 Wind Withdrawn
J2039 Not reported 345 400 Hybrid Withdrawn
J3509 Not reported n/r 380 Battery Withdrawn
J3418 Not reported 345 220 Solar Active
G412 Not reported 138 200 Coal Operational
J213 Not reported 138 200 Wind Withdrawn
J2532 Not reported n/r 200 Battery Active
J2784 Not reported 345 200 Wind Withdrawn
J3515 Not reported n/r 199.9 Battery Active
J2659 Not reported n/r 150 Solar Active
E0003 Lincoln Capital Land LLC Solar Project 138 127.8 Solar Active
J3246 Not reported 138 120 Solar Withdrawn
J2886 Not reported 138 115 Hybrid Active
J1610 Not reported 138 100 Solar Active
J2474 Not reported 138 100 Hybrid Active
J2853 Not reported 138 100 Battery Withdrawn
J1828 Not reported 138 99.2 Hybrid Withdrawn
J3892 Not reported n/r 50 Battery Active
J3395 Not reported 69 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first