MISO request J3418
MISO queue ID J3418
Queue request J3418 was listed in the MISO interconnection queue at the end of 2025 as a 220 MW solar project in Sangamon County, IL, according to Berkeley Lab’s queue data file. The filing names 7AUSTIN - 7TURNER as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 15, 2028.
| Queue ID | J3418 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | 7AUSTIN - 7TURNER |
| Point of interconnection | 7AUSTIN - 7TURNER 345.0kV |
| County | Sangamon |
| State | IL |
| Voltage | 345 kV |
| Capacity | 220 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2028-09-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Sangamon, IL: 20 requests in the MISO queue, 11 active totaling 2,627.7 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN TRANSMISSION COMPANY OF ILLINOIS |
|---|---|
| Cluster | DPP-2023 Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Study Phase: DPP 1 |
| Queue date | 2024-04-17 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.