MISO queue ID J3515

Queue request J3515 was listed in the MISO interconnection queue at the end of 2025 as a 199.9 MW battery project in Sangamon County, IL, according to Berkeley Lab’s queue data file. The filing names Interstate as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 25, 2026.

Queue IDJ3515
Project nameNot reported
Status (as published)Active
SubstationInterstate
Point of interconnection343505 Interstate
CountySangamon
StateIL
VoltageNot reported
Capacity199.9 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-05-25
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Interstate substation: 2 requests in the MISO queue, 1 active totaling 199.9 MW.

Queue IDProjectMWResourceStatus
J3509Not reported380BatteryWithdrawn

Sangamon, IL: 20 requests in the MISO queue, 11 active totaling 2,627.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityCITY WATER LIGHT & POWER
ClusterDPP-2023 Central
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.