Pike, IN interconnection queue

8 active projects totaling 993 MW in the MISO queue, plus 11 with terminal status (shown grayed).

8active projects
993active MW
19total filed
Queue IDProjectkVMWResourceStatus
G011 Not reported n/r 900 Gas Withdrawn
J2164 Not reported 345 250 Solar Withdrawn
J2507 Not reported 345 250 Solar Withdrawn
R1011 Replace 250MW of the existing Petersburg coal unit with PV and DC-coupled battery storage; Petersburg 2 345 250 Hybrid Active
J3997 Not reported 345 200 Solar Withdrawn
J3877 Not reported n/r 160 Solar Withdrawn
J1027 Not reported 161 150 Solar Active
J1028 Not reported 161 150 Solar Active
J1396 Not reported 161 150 Solar Operational
J1398 Not reported 161 150 Solar Withdrawn
J1393 Not reported 138 130 Solar Active
J3327 Not reported 69 130 Battery Withdrawn
S1112 Not reported 69 130 Battery Active
J2254 Not reported 345 100 Battery Withdrawn
J2514 Not reported 345 100 Battery Withdrawn
J3356 Not reported 69 65 Hybrid Withdrawn
J1233 Not reported 138 32.5 Battery Withdrawn
G646 Not reported n/r 30 Coal Operational
S1022 Surplus; Petersburg 14 3 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first