Surplus; Petersburg

MISO queue ID S1022

Surplus; Petersburg (S1022) was listed in the MISO interconnection queue at the end of 2025 as a 3 MW hybrid project in Pike County, IN, according to Berkeley Lab’s queue data file. The filing names PETEUA31 4. as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 11, 2023.

Queue IDS1022
Project nameSurplus; Petersburg
Status (as published)Active
SubstationPETEUA31 4.
Point of interconnectionPETEUA31 4.14kV
CountyPike
StateIN
Voltage14 kV
Capacity3 MW
Resource (as published)Solar+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2023-10-11
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pike, IN: 19 requests in the MISO queue, 8 active totaling 993 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
Project typeGeneration
Queue date2022-05-02
Components (hybrid)Solar 3 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.