Substation Scout

MISO request J1396

MISO queue ID J1396

Queue request J1396 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW solar project in Pike County, IN, according to Berkeley Lab’s queue data file. The filing names Ratts-Victory Line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 20, 2024.

Queue IDJ1396
Project nameNot reported
Status (as published)Operational
SubstationRatts-Victory Line
Point of interconnectionRatts-Victory 161kV Line
CountyPike
StateIN
Voltage161 kV
Capacity150 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2024-08-20
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pike, IN: 19 requests in the MISO queue, 8 active totaling 993 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityHOOSIER ENERGY
ClusterDPP-2019 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: In Service
Queue date2019-04-29
Interconnection agreement date2023-06-12
Operational date2024-08-20

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first