Substation Scout

MISO request S1112

MISO queue ID S1112

Queue request S1112 was listed in the MISO interconnection queue at the end of 2025 as a 130 MW battery project in Pike County, IN, according to Berkeley Lab’s queue data file. The filing names Cato 138/ (facilities above ) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2027.

Queue IDS1112
Project nameNot reported
Status (as published)Active
SubstationCato 138/ (facilities above )
Point of interconnectionCato 138/69kV (facilities above 100kV)
CountyPike
StateIN
Voltage69 kV
Capacity130 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2027-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cato 138/ (facilities above ) substation: 2 requests in the MISO queue, 1 active totaling 130 MW.

Queue IDProjectMWResourceStatus
J3327Not reported130BatteryWithdrawn

Pike, IN: 19 requests in the MISO queue, 8 active totaling 993 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySouthern Indiana Gas & Electric Company d/b/a Centerpoint Energy Indiana South
Project typeGeneration
Queue date2025-08-11

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first