Peoria, IL interconnection queue
8 active projects totaling 2,474 MW in the MISO queue, plus 1 with terminal status (shown grayed).
8active projects
2,474active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3860 | Not reported | 345 | 500 | Wind | Active |
| J3712 | Not reported | 345 | 400 | Wind | Active |
| J4004 | Not reported | n/r | 392 | Solar | Withdrawn |
| R1055 | Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3 | 138 | 322 | Hybrid | Active |
| J2377 | Not reported | 345 | 300 | Battery | Active |
| J3216 | Not reported | n/r | 300 | Battery | Active |
| J3078 | Not reported | 345 | 252 | Wind | Active |
| J2275 | Not reported | 345 | 250 | Wind | Active |
| J4007 | Not reported | 345 | 150 | Wind | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.