Peoria, IL interconnection queue

8 active projects totaling 2,474 MW in the MISO queue, plus 1 with terminal status (shown grayed).

8active projects
2,474active MW
9total filed
Queue IDProjectkVMWResourceStatus
J3860 Not reported 345 500 Wind Active
J3712 Not reported 345 400 Wind Active
J4004 Not reported n/r 392 Solar Withdrawn
R1055 Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3 138 322 Hybrid Active
J2377 Not reported 345 300 Battery Active
J3216 Not reported n/r 300 Battery Active
J3078 Not reported 345 252 Wind Active
J2275 Not reported 345 250 Wind Active
J4007 Not reported 345 150 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.