MISO request J2275

MISO queue ID J2275

Queue request J2275 was listed in the MISO interconnection queue at the end of 2025 as a 250 MW wind project in Peoria County, IL, according to Berkeley Lab’s queue data file. The filing names Fargo to Sandburg as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 31, 2025.

Queue IDJ2275
Project nameNot reported
Status (as published)Active
SubstationFargo to Sandburg
Point of interconnectionFargo to Sandburg 345kV
CountyPeoria
StateIL
Voltage345 kV
Capacity250 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2025-10-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Fargo to Sandburg substation: 2 requests in the MISO queue, 2 active totaling 502 MW.

Queue IDProjectMWResourceStatus
J3078Not reported252WindActive

Peoria, IL: 9 requests in the MISO queue, 8 active totaling 2,474 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN TRANSMISSION COMPANY OF ILLINOIS
ClusterDPP-2021 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-03-22

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.