Queue request J3860 was listed in the MISO interconnection queue at the end of 2025 as a 500 MW wind project in Peoria County, IL, according to Berkeley Lab’s queue data file. The filing names 7FARGO - 7SANDBURG as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 2, 2030.

Queue IDJ3860
Project nameNot reported
Status (as published)Active
Substation7FARGO - 7SANDBURG
Point of interconnection7FARGO - 7SANDBURG 345.0kV
CountyPeoria
StateIL
Voltage345 kV
Capacity500 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2030-04-02
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

7FARGO - 7SANDBURG substation: 6 requests in the MISO queue, 6 active totaling 1,750 MW.

Queue IDProjectMWResourceStatus
J3712Not reported400WindActive
J3027Not reported300HybridActive
J3498Not reported300SolarActive
J4007Not reported150WindActive
J3344Not reported100BatteryActive

Peoria, IL: 9 requests in the MISO queue, 8 active totaling 2,474 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP Cycle Pending Central
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-01-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first