Ottawa, MI interconnection queue

8 active projects totaling 2,277 MW in the MISO queue, plus 9 with terminal status (shown grayed).

8active projects
2,277active MW
17total filed
Queue IDProjectkVMWResourceStatus
R1040 Replacing 749 MW of coal generation with BESS; Campbell 3 345 749 Hybrid Active
J4159 Not reported n/r 664 Gas Active
J4160 Not reported n/r 425 Gas Active
J1527 Not reported 345 200 Solar Withdrawn
J1556 Not reported 138 200 Solar Withdrawn
J1663 Not reported 345 200 Solar Active
J3258 Not reported n/r 200 Battery Withdrawn
J3320 Not reported n/r 200 Battery Withdrawn
J931 Not reported 345 150 Wind Withdrawn
J1423 Not reported 138 100 Solar Withdrawn
J1580 Not reported 138 100 Solar Withdrawn
J190 Not reported 345 100 Wind Withdrawn
J2499 Not reported 138 100 Battery Active
J809 Not reported 138 99 Solar Withdrawn
J1880 Not reported 345 60 Battery Active
J1984 Not reported 138 50 Battery Active
G479 Not reported 345 29 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.