Queue request J2499 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW battery project in Ottawa County, MI, according to Berkeley Lab’s queue data file. The filing names Blendon as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 7, 2026.
| Queue ID | J2499 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Blendon |
| Point of interconnection | Blendon 138 kV |
| County | Ottawa |
| State | MI |
| Voltage | 138 kV |
| Capacity | 100 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2026-03-07 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Ottawa, MI: 17 requests in the MISO queue, 8 active totaling 2,277 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | METC |
|---|---|
| Cluster | DPP-2022 East (ITC) |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Study Phase: DPP 2; Post GIA Status: Not Started |
| Queue date | 2022-09-12 |