MISO request G479

MISO queue ID G479

Queue request G479 was listed in the MISO interconnection queue at the end of 2025 as a 29 MW coal project in Ottawa County, MI, according to Berkeley Lab’s queue data file. The filing names Campbell Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 1, 2008.

Queue IDG479
Project nameNot reported
Status (as published)Operational
SubstationCampbell Substation
Point of interconnectionCampbell 345kV Substation
CountyOttawa
StateMI
Voltage345 kV
Capacity29 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2008-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Campbell Substation substation: 2 requests in the MISO queue, 2 active totaling 778 MW.

Queue IDProjectMWResourceStatus
R1040Replacing 749 MW of coal generation with BESS; Campbell 3749HybridActive

Ottawa, MI: 17 requests in the MISO queue, 8 active totaling 2,277 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2004-10-26
Interconnection agreement date2006-08-29
Operational date2008-08-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.