Queue request J4160 was listed in the MISO interconnection queue at the end of 2025 as a 425 MW gas project in Ottawa County, MI, according to Berkeley Lab’s queue data file. The filing names ROOSEVELT as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 31, 2026.

Queue IDJ4160
Project nameNot reported
Status (as published)Active
SubstationROOSEVELT
Point of interconnectionROOSEVELT
CountyOttawa
StateMI
VoltageNot reported
Capacity425 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2026-05-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

ROOSEVELT substation: 3 requests in the MISO queue, 2 active totaling 1,089 MW.

Queue IDProjectMWResourceStatus
J4159Not reported664GasActive
J3320Not reported200BatteryWithdrawn

Ottawa, MI: 17 requests in the MISO queue, 8 active totaling 2,277 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP Cycle Pending East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-08-13

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.